Item 146 - Repairs to College Rooms

Identity area

Reference code

JCCA/JCAD/2/2/9/1874/146

Title

Repairs to College Rooms

Date(s)

  • 30th November 1874 (Creation)

Level of description

Item

Extent and medium

5 items, paper, pinned, in envelope with 144 and 145.

Context area

Name of creator

(fl.1854-1875)

Administrative history

Archival history

Immediate source of acquisition or transfer

Content and structure area

Scope and content

Receipt for taking down encaustic tiles and clean and fix new ones to jambs of fireplace and hearth - including costs of labour, plaster, a jack, and cement - in Mr Morgan's rooms, M staircase (rooms 1, 3-6), N staircase (rooms 1-4), Lecture Room, Mr Crouch's room, O staircase (rooms 1-4);
For repairing plaster over door in Q staircase (rooms 5 and 6), P staircase (rooms 1, 4-5);
For making a model for stove, and for repairing floor and ease door in Mr Morgan's rooms;
For repairing chimney piece in F staircase, room 4;
For making and hanging a door, preparing jambs to receive the door, repairing two other doors; lining wall with boarding, and punching down the nail heads on the staircase in Mr Fairbairn's rooms (including cost of materials);
For preparing and fixing tiles to side of fire place in Mr Crouch's room;
For repairing and fixing two casements and frames in bedroom and pipe room in B staircase (including cost of materials);
For repairing the plastering in Mr Campion's and Mr Whiteley's rooms;
For painting [?] windows and repairing plastering in C and D staircase;
For taking down, cleaning, and refixing tiles to the fireplace (including cost of labour and materials), making good the walls, fixing the sideboards, and fixing the ventilator in Dr Westmorland's rooms;
For making good the walls in Dr Thompson's room;
For repairing plastering in bedroom and over door in sitting room after putting in new ventilators in L staircase;
For repairing plasterwork and digging out earth for new floor in L[?]'s rooms (including costs of labour (labourers and bricklayers), bricks, mortar, and waster disposal);
Various other similar repairs (windows, plastering, doors etc.) in B3, I2, I5, I9, C2, H1, H9, F1;
Preparing and fixing 3 casements and new door and frame and jamb linings in lecture rooms and repair floor (H1), including costs of material (deal, screws, casement fastenings, and labour time);
Rehanging and repairing shutters in E1;
Work to windows and fixing cabin hooks in C staircase (including brass hooks and screws, and 11 hours labour).
Total cost £33 14s 7d.

Appraisal, destruction and scheduling

Accruals

System of arrangement

Conditions of access and use area

Conditions governing access

Conditions governing reproduction

Language of material

    Script of material

      Language and script notes

      Physical characteristics and technical requirements

      Finding aids

      Allied materials area

      Existence and location of originals

      Existence and location of copies

      Related units of description

      Related descriptions

      Notes area

      Alternative identifier(s)

      Access points

      Subject access points

      Place access points

      Name access points

      Genre access points

      Description control area

      Description identifier

      Institution identifier

      Rules and/or conventions used

      Status

      Level of detail

      Dates of creation revision deletion

      Language(s)

        Script(s)

          Sources

          Accession area